Zenith V2 — Project-First Opportunity Engine
Implements Tom Friberg’s exact 4-step workflow: Set Constraints/Filters → Find Projects (189) → Find Companies & Contacts → Save as ‘Shortlisted / Watch’ or ‘Not Relevant’.
Every application, interactive lifecycle blueprint, and primary-source deal pack in one place—optimised for desktop, tablet, and mobile. Start with the V2 Project-First rebuild from Tom Friberg’s feedback, then inspect the 4 Audit-Clean Deal Sheets and SWIS Grid Engine.
Filter by project scale first. Unmask the shell company second.
Flips Company-First → Project-First · Separates 121 Single-Project SPV Shells from 236 Parent Developer Brands
Implements Tom Friberg’s exact 4-step workflow: Set Constraints/Filters → Find Projects (189) → Find Companies & Contacts → Save as ‘Shortlisted / Watch’ or ‘Not Relevant’.
Identical 4-step Project-First workflow, residence/area/MW filters, and SPV shell unmasking—100% stripped of Zenith Energy references and microgrid rules.
106 SWIS Zone Substations · 5 Reverse-Engineered Reference Microgrids · Two-Pipe Landgate + DAP Matcher · 1,495 Estates
Statewide Western Power SWIS constraint timeline, reference microgrid benchmarks, and upstream trigger matcher:
Every ACN Modulus-10 verified · Every MVA & $ figure tied to primary filings & Slide 4 Excel cells
Both the Unredacted Zenith Edition (with full ACNs, developer names, and gatekeeper contacts) and the Anonymised Blind Origination Bait Edition (`bait-deals-argonbuildhackathon.aiperth.co`).
Qube Property Group · Engineered by JDSi. 2,500 dwellings / 13.50 MVA hitting JDSi’s published 8.0 MVA single-feeder cap while Wanneroo ZS is overloaded to 2030. Pitched as 3 × 4.50 MVA staged microgrids.
Troon Group ($79.8M purchase across ACN 697 850 221). Targeting early-2027 Stage 1 release vs Western Power feeder MUC 536 needing 16.4 km cable by 30 June 2028.
Land Group WA (ACN 683 136 969) · Engineered by Colliers. Gazetted 13 Mar 2026, 53.6 ha, ~776 dwellings (4.19–7.28 MVA — fits a single <10 MW microgrid at full build!).
Waterways Coodanup (ACN 691 013 297, EPBC 2026/10595) & BMP Land Projects Pinjarra (ACN 701 553 433, GST activated 19 Aug 2026) on the Mandurah→Pinjarra load-transfer squeeze.
Traces Peel (EDL7), Eglinton (EDL10), Ocean Reef (EDL9) & Knutsford from Day-0 Land Assembly to ERAWA Licence
End-to-end 10-phase architectural board showing how WA estates move from ASIC SPV & Rezoning → Engineering Gatekeeper → Western Power 8 MVA Feeder Wall → Zenith BOO Microgrid.
Click through each gate of the WA property-to-microgrid lifecycle with exact statutory lead times, Western Power triggers, and sensor hooks.
Dedicated landscape reverse-engineering blueprints for each of Zenith’s live WA reference microgrids and LandCorp/DevelopmentWA benchmarks.
Free NSW Valuer General + Planning + ASIC/ABR cross-matching & the original V1 portals
Interactive eco-themed explorer connecting NSW property sales, ASIC/ABR street-named SPV candidates, planning portal SEARs/EIS filings, and Endeavour Energy constraints.
Full verbatim research proof showing Path A (Title/Dealing) and Path B ($0 ASIC/ABR + Planning VPA/SEARs cross-match) across 32 NSW sites.
Direct access to both the no-login V1 Zenith CRM (`357` organisations) and the live Cloudflare-protected / public `aiperth.co` domains emailed to Tom.